Project Risk Patterns: A Comparison Across Three Periods

- Fachrurrazi, Saiful Husin, - Mahmuddin

Abstract


Aceh has experienced the critical event in three periods (political conflict, tsunami disaster, regular period) which they are different in risk characteristics. These critical events have inflicted on the sectors of life, including the construction sector. Some risk variables have been identified from previous studies that will be applied and analysis in this area by using risk assessment theory. In this research, we focus on the project risks in the three periods that it has an impact on the loss of profit on the contractors in Aceh. The potential risk variable and its pattern will be analyzed crossover in all the three periods. Qualitative risk analysis is used to describe the project risk of contractors who have conduct project in those periods. The potential risk variable, unofficial levies charges by bullies (P11), is the most extreme than other risks variables in the 1st period, has decreased in subsequent periods (2nd period and third period). The risk variable of P11 is the most avoided by the contractor because it is very influential on the achievement of the project objectives. This P11 variable not only emerged during the political conflict period but also in the post-tsunami period due to social, economic factors, although it has decreased. This P11 variable not only affects the risk singly but also could trigger the other variable, thus providing a double effect on project risks, such as increased costs for safety and security in project areas (P5) and Increased labor costs due to increased wages (P6). The result of risk analysis using qualitative risk analysis method with Risk Important Index (RII) shows that risk variable of P1 (Bureaucratic of the owner delays payment terms), P12 (Contractors shortage of funds caused by the cost overrun on the project), has experienced decreasing from 2nd period to 3rd period. However, the hypothesis results show that the decreasing is not significant. It indicates that this test is critical to include in risk analysis, especially on the method of qualitative risk analysis.

Keywords


risk assessments; contractors; hypothesis; the three critical periods; unofficial levies charges by bullies; frequency index; severity index; important index; risk matrix; risk pattern; Aceh.

Full Text:

PDF

References


Fachrurrazi, S. Husin, Munirwansyah, and Husaini, “The Subcontractor Selection Practice using ANN-Multilayer,†International Journal of Technology, vol. 8, no. 4, p. 761, Jul. 2017.

S. Nazara, B. P. Resosudarmo, “Aceh-Nias Reconstruction and Rehabilitation: Progress and Challenges at the End of 2006, 2007,†ADB Institute Discussion Paper, No. 70, 2007.

L. M. Khodeir and A. H. M. Mohamed, “Identifying the latest risk probabilities affecting construction projects in Egypt according to political and economic variables. From January 2011 to January 2013,†HBRC J., vol. 11, no. 1, pp. 129–135, Apr. 2015.

H. Abdul-Rahman, C. Wang, and F Sheik Mohamad, “Implementation of Risk Management in Malaysian Construction Industry: Case Studiesâ€. J. Constr. Eng. 2015.

M. S. B. A. Abd El-Karim, O. A. Mosa El Nawawy, and A. M. Abdel-Alim, “Identification and assessment of risk factors affecting construction projects,†HBRC J., Jun. 2015.

Fachrurrazi, S. Husin, Tripoli, and Mubarak, “Neural Network for the Standard Unit Price of the Building Area,†Procedia Engineering, vol. 171, pp. 282–293, 2017.

Z. Sigmund and M. Radujković, “Risk Breakdown Structure for Construction Projects on Existing Buildings,†Procedia - Soc. Behav. Sci., vol. 119, pp. 894–901, Mar. 2014.

B. T. Saragiotto, T. P. Yamato, L. C. Hespanhol Junior, M. J. Rainbow, I. S. Davis, and A. D. Lopes, “What are the main risk factors for running-related injuries?,†Sports Medicine, vol. 44, no. 8. pp. 1153–1163, 2014.

K. M. Baroang, M. Hellmuth, and P. Block, “Discussion Paper Identifying uncertainty and defining risk in the context of the WWDR-4†Perugia, Italy, (2009).

G. M. Sullivan, “A primer on the validity of assessment instruments.†J. Grad. Med. Educ., vol. 3, no. 2, pp. 119–20, Jun. 2011.

M. M. Hossen, S. Kang, and J. Kim, “Construction schedule delay risk assessment by using combined AHP-RII methodology for an international NPP project,†Nucl. Eng. Technol., vol. 47, no. 3, pp. 362–379, Apr. 2015.

J. D. Brown, "Likert items and scales of measurement." Shiken: JALT Testing & Evaluation SIG Newsletter 15, no. 1, pp. 10-14, (2011).

DASDSE, “Risk, Issue, and Opportunity Management Guide for Defense Acquisition Programs,†2015.

H. Dezfuli, A. Benjamin, C. Everett, G. Maggio, M. Stamatelatos, and R. Youngblood, “NASA Risk Management Handbook,†no. November, p. 15, Nov. 2011.

F. D. Control et al., “Guidelines for Risk Management Guidelines for Risk Management Rationale for Change,†pp. 1–40, 2014.

L. Jodkowski, “Possibilities and Methods of Risk Assessment under ISO 9001 : 2015,†vol. 3, no. 10, pp. 14–23, 2015.

P. Zeccola, “Dividing disasters in Aceh, Indonesia: Separatist conflict and tsunami, human rights and humanitarianism,†Disasters, vol. 35, no. 2, pp. 308–328, Apr. 2011.

N. D. Long, S. Ogunlana, T. Quang, and K. C. Lam, “Large construction projects in developing countries: A case study from Vietnam,†Int. J. Proj. Manag., vol. 22, no. 7, pp. 553–561, 2004.

A. Giddens, "Risk and responsibility." The modern law review, vol. 62, no. 1, pp. 1-10, 1999.

F. Steinberg, “Housing reconstruction and rehabilitation in Aceh and Nias, Indonesia-Rebuilding lives,†Habitat Int., vol. 31, no. 1, pp. 150–166, 2007.

K. H. Rose, “A Guide to the Project Management Body of Knowledge (PMBOK® Guide)-Fifth Edition.†Proj. Manag. J. 2013.

Fachrurrazi, “Study of Unit Price for Competitive Bidding Based on CCI (Construction Cost Index) for Building†Int J Eng Res. 2016.




DOI: http://dx.doi.org/10.18517/ijaseit.8.5.3935

Refbacks

  • There are currently no refbacks.



Published by INSIGHT - Indonesian Society for Knowledge and Human Development